Design & Architecture

Each Home is Designed Specially for You

Floor Plan and Elevation

Based on the design brief provided by the clients one concept of floor plan (2D) will be developed. Change iterations to this will be undertaken based on client feedback. For each iteration, 3 days are provided to the client for feedback and 3 days are allotted to ArihantBuildtech to make the suggested updates. Through this iterative process the floor plan will be finalised within a period of 45 days.
Elevation will be as per homeowners selection from ArihantBuildtech’s catalogue. Additional charges may be applicable based on elevation selected or for a custom elevation design outside the catalogue.

Services and Construction Drawings

Included. Drawings will be developed based on ArihantBuildtech’s guidelines for configuration of the respective services - electrical, plumbing, AC, video door phone, CCTV.
Services drawings will also include services design for the kitchen and all such services drawings will be completed in one stage. If client takes a decision on modular kitchen at this stage, modular kitchen can also be designed along with it. Else, modular kitchen can be designed later based on the services planned.
Services drawings will be shared with the client at project handover.

Approval drawings & file

Included

Material /Concept selection

Selection of finishing materials and concepts like bathroom fittings, flooring, paint shades, false ceiling concepts, hardware selection, windows and finish selection for doors will be done by client from ArihantBuildtech’s catalogues. Architect’s visit along with clients for material selections are not included.

Document format

All drawings, catalogues and guidelines will be shared in soft copies - PDF, Images or Google Docs.

Structure

Robust Structures that
Last for Generations

Demolition of existing Structure
(if any) / Clearance of Site

ArihantBuildtech will undertake demolition if required. Owner can remove any of the removable/movable things (e.g. fans, fixtures) they like from the property before handover for demolition. Building to be in lockable condition when handed over to ArihantBuildtech after which barricading will be done. Post handover, ArihantBuildtech will bear the responsibility of damages (if any) during the demolition. Demolition phase will increase the project timeline by one month.
In case there is an existing basement at the site then the demolition period will be increased further by 15 days and extra charges for demolition/excavation will be applicable as per the assessment.

Structure

Design is as per IS Codes and is Earthquake Seismic Zone IV Compliant. Structural load will be for the number of floors being constructed. Extra charges will be applicable in case of a) special requirements over & above the standard compliant structure (e.g. increasing column span/width, zone V compliance), b) In case soil condition is not normal (high water level, loose soil, rocky terrain etc.), c) In case plot level is below the road level by more than 1 ft

Excavation and Foundation

Done as per Codes

PCC

PCC will be done in the ratio of 1:4:8

Concrete

Slabs and beams - RMC (RDC Concrete, Prism Johnson, Kamdhenu or ACC) of M25 grade or as specified by Structural Engineer
Foundation and columns - Site-mix Concrete (Shree Cement/ JK Cement/ ACC/ Ultratech)

TMT Steel

FE 500 Steel from Rathi / Kamdhenu / Kay2 as per structural drawings

Brickwork

Fly Ash / Red Bricks (first class) will be used as per availability & feasibility on project site.

Plaster & POP

Cement-sand plaster (Shree Cement/JK Cement/ACC/Ultratech) is used (1:5 on internal walls & 1:4 on external wall). Mesh is used on joints of walls and concrete to protect them from cracks. POP on internal walls. Ceiling is finished with a combination of plaster, putty & false ceiling, as applicable.

Floor to floor height (including slab)

Height will be upto 10 ft.

Plinth height

As per the design, upto 1.5 feet from the road level. Plinth height of more than 1.5 feet will incur additional charges.

Tarai / Curing

Curing compound used

Plumbing Services

Thought through Plumbing and Water Management

Floor Plan and Elevation

Based on the design brief provided by the clients one concept of floor plan (2D) will be developed. Change iterations to this will be undertaken based on client feedback. For each iteration, 3 days are provided to the client for feedback and 3 days are allotted to ArihantBuildtech to make the suggested updates. Through this iterative process the floor plan will be finalised within a period of 45 days.
Elevation will be as per homeowners selection from ArihantBuildtech’s catalogue. Additional charges may be applicable based on elevation selected or for a custom elevation design outside the catalogue.

Services and Construction Drawings

Included. Drawings will be developed based on ArihantBuildtech’s guidelines for configuration of the respective services - electrical, plumbing, AC, video door phone, CCTV.
Services drawings will also include services design for the kitchen and all such services drawings will be completed in one stage. If client takes a decision on modular kitchen at this stage, modular kitchen can also be designed along with it. Else, modular kitchen can be designed later based on the services planned.
Services drawings will be shared with the client at project handover.

Approval drawings & file

Included

Material /Concept selection

Selection of finishing materials and concepts like bathroom fittings, flooring, paint shades, false ceiling concepts, hardware selection, windows and finish selection for doors will be done by client from ArihantBuildtech’s catalogues. Architect’s visit along with clients for material selections are not included.

Document format

All drawings, catalogues and guidelines will be shared in soft copies - PDF, Images or Google Docs.

Electrical Services

Fire Safe Electrical Planning

Electricity Meters

Provisioning for one electricity meter per floor and one electricity meter for the common area, if allowed by the Electricity company, else one sub-meter for the common area.

Electrical Wires and Circuitry

Wires from Anchor / Havells / Finolex / KEI. Separate circuit for light & power/AC. Kalinga/ Polycab wire from electricity pole till LT panel/ meter.
Main Panel to Distribution Board: 10 sq mm wires
Light circuit: 1.5 sq mm wires
Power circuits: 4 sq mm wires
AC: 2.5 sq mm wires, 2 core wires. Switch and socket near the outdoor unit.
Light points, Earthing: 1 sq mm wires
Power points, Geysers: 2.5 sq mm wires

Provision for equipments
(equipment not included)

1.  TV wiring: A single CAT 6 wire from mumty dish to LV junction box on each floor. A splitter in LV junction box to split CAT 6 wire to each TV point in thebedroom/living/dining room with CAT6 wire.
2.  Telephone provision in one central location with RJ6/RJ14 wires.
3.  Only conduits (with steel wire) will be provisioned for the following
  a.  CCTV, VDP, Motion sensors, Intrusion alarm systems
  b.  Wi-fi router - Conduit from the external point till the router point with ajunction box

Conduits

AKG/ Anchor

Earthing pit

2 earthing pits for the home and 2 additional earthing pits if there is a lift provision; GI pipes with chemically filled material upto depth of 3 mtrs

Switches

Anchor Roma Urban / Havells

MCBs, ELCBs, Distribution
Board & LT Panel

Anchor / Havells / L&T / ABB

Flooring

Beautiful Flooring options
for premium looking homes

Internal Flooring

Glazed vitrified tiles from Kajaria Eternity (upto 600 mm x 1200 mm) in drawing, living, dining space, bedrooms, passages, lobby and kitchen. All tiles in the house will be laid without gaps with grouting.

Bathroom (Floor + Walls) & kitchen walls

Glazed vitrified tiles from Kajaria Eternity (upto 300 mm x 600mm). In Kitchen, tiles will be installed upto 2 ft. above the counter area

Balcony Floor

Matt vitrified tiles from Kajaria Eternity of size upto (upto 600 mm x 600 mm)

Staircase (Tread , riser & skirting), Stilt & Open Area

Granite from ArihantBuildtech catalogue.

Terrace flooring

Matt vitrified tiles from Kajaria Eternity of size upto (upto 600 mm x 600 mm).

Kitchen and bathroom counter

Granite from ArihantBuildtech catalogue.

Toilet on Stilt, Terrace & Servant Room.

White commercial tiles (upto 300 mm x 300 mm).

Mumty top .

Fly-ash/Red Brickwork

Doors

Strong factory-made doors which blend with interiors perfectly

Main Door (For each apartment and stilt)

Opening Size: Upto 1200 mm wide (depending on the space. The height of the doors will be 7.5 feet. All dimensions are plaster to plaster.)
Door and Frame: Factory made engineered wood doors with warranty with veneer finish. Selection from Arihant Buildtech catalogue
Hardware: Handle, night latch, magic eye, chain, hinges, 12 inch bolts & doorstop from ArihantBuildtech catalogue

Internal Door

Opening Size: Upto 900/1050 mm wide (depending on the space) for Bedrooms and 750 mm wide for Bathrooms. The height of the doors will be 7.5 feet. All dimensions are plaster to plaster.
Doors and Frames: Factory-made engineered wood door with warranty with laminate finish. Selection from ArihantBuildtech catalogue.
Hardware: Cylindrical lockset handles, hinges, 12 inch bolts, magnetic catcher from ArihantBuildtech catalogue
Number of doors: One in each bedroom, bathroom and kitchen.

Doors Provided

For each Floor: One main door, one door for kitchen, one door for each bedroom & one door for each bathroom/powder room and one door at stilt and mumty.
Mumty door will be a casement door similar to the material of windows.
Servant room, toilet on stilt & terrace: Aluminium door and frame with WPC panelling.

Special Internal Doors

Special internal doors like sliding, folding, glass doors, drawing room doors, puja/store room doors are charged separately as per design.

Windows

Large Windows for
Maximum Natural Light

Material

White colour, single glazed UPVC or factory made Extruded Aluminium Windows with toughened glass for all the rooms and kitchen.
Site-made section aluminium windows for the bathrooms and staircase with clear glass.
Total area of windows in the home, can be upto 15% of the covered area (excluding basement) as per design. In case there is a sunken courtyard, its window area can be upto 35% of the sunken courtyard area as per design.

Design

  1. 1. Combination of fixed & sliding windows in the habitable spaces of house with fibre bug-mesh.
  2. 2. Fixed window in staircase
  3. 3. Top hung window without bug-mesh with provision for exhaust fan in bathrooms.
  4. 4. Windows in the shaft will have frosted glass.
  5. 5. Casement door (without bug mesh) will be used for opening of less than 3 feet

Bathroom & Kitchen Fittings & Fixtures

Add Elegance to your Bathroom with Premium Fittings and Fixtures

Design

3 fixture Bathrooms (Basin, WC and Shower area)

Bathroom on habitable floors & Bathroom in basement (included only if allowed as per bye law)

Jaquar fittings
1. Basin Area: Wall mounted faucet with concealed divertor, counter mounted basin
2. WC area: Wall hung WC with soft closing seat and concealed cistern, health faucet, tissue holder. Handrail in one bathroom per habitable floor, subject to design.
3. Shower area: Single lever mixer with overhead shower, hand shower, bath spout
4. Accessories & provisions: Towel ring, drains, angle walls for geysers and doublerobe hook.

Bathroom on stilt, terrace or servant room on habitable floor

From ArihantBuildtech catalogue (included only if they are allowed as per the applicable bye-laws)

Bathroom Concept

To enhance aesthetic and functionality of the bathroom, upto 2 niches of size 18’’ x 18’’ and finished in tiles used in bathroom. 2 ft by 3.5 ft Frameless float glass mirror.

Geyser Provisioning

When bathroom is next to balcony: Outside in balcony or inside as per owner's preference. When bathroom is not next to balcony: Inside bathroom.

Exhaust

Havells/ Crompton exhaust fan in bathroom & kitchen with external inbuilt cover.

Tap and Sink (in Kitchen)

Sink and faucet from ArihantBuildtech catalogue for each kitchen. Stainless steel single bowl sink with drainboard and wall mounted sink mixer from Jayna

Other Essential Services

Hassle-Free Living during and after Construction

Site Barricading

Site and building barricading as per the rules.

Waterproofing

Dr. Fixit / Sika - On terrace, bathroom and mumty floor.

Anti termite treatment

Done at plinth level with Bayer anti-termite chemical.

Water and electricity bill during construction

Monthly recurring bills are paid by ArihantBuildtech from the day of handover of plot to the day of delivery. Any security deposit has to be paid by the owner on actuals.

Approvals

Drawing file prepared & submitted for building plan approvals. File prepared & submitted for water & electricity connection.
All official fees & expenses for building permit, plinth CC, completion certificate, sewage connection, permanent water & electricity connection are paid by owner on actuals.
All out of pocket expenses for building permit, plint CC, and completion certificate are paid by owner and are not included in this price. Client has choice either to get these approvals through us for a fixed price (which will be additional to the price of construction) or through self. In case client desires to do it through self, we will prepare the file and submit it on behalf of the owner and the owner will take responsibility for the required approvals as per the project plan.
Local Coordination: Coordination with police department, road department & pollution department, water and electricity department will be part of ArihantBuildtech. All out of pocket expenses related to this are borne by ArihantBuildtech.
Any project specific approvals other than those mentioned above (e.g. ASI, tree cutting, pole shifting, etc) are not included and will be additional

RWA Fee

Any one time fee, recurring fee or security deposit has to be paid by the owner on actuals. If any damage is caused to the roads, etc. then ArihantBuildtech will repair as is.

Provision for other Fittings & Fixtures

Hassle-Free Living during and after Construction

For Lift

Civil structure for lift is done as per planned size and number of stops.

For Lights

Wiring and boxes are installed for all light fixtures as per homeowner’s decision.

For Motors and Automation system

From the planned installation point, required conduits are laid till the under-ground tanks and over-head tanks for motors and automation.

For Security system (CCTV, Video door phone, intrusions alarm system)

As per the design, required conduits are laid in structure and brickwork.

For Air Conditioners

Copper pipes of 1/2 and 1/4 with insulation and 2-core wire of 2.5 sq mm thickness. Outdoor units to be placed either on front or back. Average length of the copper pipe between the outdoor and the indoor unit will be upto 25 feet. Provision for ACs for bedrooms and living rooms is included. Provision for additional ACs in other areas like kitchen, bathroom, walk-in robe will be charged extra.

For Inverter

Provisioning only for all lights, fans and 6 amp points.
Provision for inverters: Placement in the staircase.

For Modular Kitchen

White commercial tile or spare tile from other areas to be cladded on wall behind the modular kitchen area.

Finishing

Elegant, Stylish &
Sophisticated Finishes

RAMPS AND SILL
Ramp, Parapet tops, Window sills

Ramp and pedestrian steps (as per ArihantBuildtech catalogue) finished with granite from stilt, joined with road finished with cement / PCC. Granite will be same as the granite used in stilt. Ramp and related earth work will be provided in front of the gate only and upto 5 ft wide between the gate and the road. In front of the boundary wall(s), the pre-existing surface will be cleaned of construction debris, if any and levelled.

Civil work parapets in front balcony, front boundary wall and window sills in staircase will have same granite as used in staircase. Window sills in rooms will have same marble as used in floor inside. In case of tiles or wooden flooring, granite used in stilt will be used.

WALLS & CEILINGS
Internal Finish

Internal Walls: Royale from Asian Paints or its equivalent from Berger/ ICI.
Internal ceilings, bathroom & kitchen walls: Apcolite from Asian Paints or its equivalent from Berger/ ICI.
Staircase: Superfine texture on walls and flat paint on ceilings as per ArihantBuildtech Catalogue
Rooms & toilet for servants, store room: Tractor Emulsion from Asian Paints or its equivalent from Berger/ ICI
Lift shaft: Distemper paint.

External Walls, Terrace, Balcony

Elevation and balconies: Mix of flat paint, texture and super-fine texture as per ArihantBuildtech Catalogue
Stilt: Mix of rustic texture and flat paint as per ArihantBuildtechCatalogue
Terrace: Texture as per Arihant Buildtechcatalogue
Shafts, Courtyards: Rustic texture from ArihantBuildtechCatalogue

Cove & false ceiling

6” cove made with provision for strip lights in living/dining areas & all bedrooms - design selected from ArihantBuildtechcatalogue. False ceiling in bathrooms to conceal plumbing pipes as required.

Neighbours wall

Uncovered wall of your home towards the neighbours’ house will be plastered and painted in snowcem. Any neighbours’ wall towards your home can be plastered and painted in snowcem for an additional charge.

NAME PLATE
Name plate and Letter box

Plot No in steel alphabets and name plates in steel with etching and letter box for each dwelling unit in the gate pillar made as per architect design.

FABRICATION
Staircase railing

MS Railing with enamel paint of 3’5” height. Design from ArihantBuildtech catalogue.

Balcony railing as part of elevation

MS railings as per design selected by homeowner from ArihantBuildtech catalogue. Total height of railing and toe-wall will be 3’ to 3’5”. Railing will be finished with enamel paint.

Mumty ladder

Wall mounted service ladder to access mumty top and lift top (in case lift top is different from mumty top).

Gate

6’ high gates will be planned for pedestrian and car movement. Total width of gates will not be more than 23 ft (2 gates for car movement of 10 ft width and 1 gate for pedestrian of 3 ft width). Design of gates will be selected from ArihantBuildtech catalogue. Gate will be finished with enamel paint.

Basement

Add more Charm and Functionality
with Basement

Side walls

Concrete retaining walls complying to structural drawings.

Waterproofing

On all 4 sides and floor with crystalline water proof compound.

Proper Drainage and Sewerage with Sump Pit (If Applicable)
YES

Internal partitions/ walls

As per bye-laws

Toilet

As per bye-laws (refer section on Bathrooms)

AC

Provisioning only, i.e. complete copper piping, drain pipe layout and 16 Amp point with 2.5 sqmm 2 core wire, for AC will be done. Average length of the copper pipe between the outdoor and indoor unit will be upto 25 feet.

Paint

Walls: Royale or similar from Asian Paints/ Berger/ ICI. Ceiling: Apcolite or similar from Asian Paints/ Berger/ ICI.

Main Door

Opening Size: Upto 4'-0" wide x 7'-6" high door.
Pre Laminated Factory Made Doors & Frames. One door provided at entry to basement.
Hardware: Handle, night latch, magic eye, chain, hinges, 12 inch bolts, doorstop.

Sunken Courtyard

Finished with Glazed vitrified tiles from Kajaria Eternity (600 mm x 1200 mm) from ArihantBuildtech catalogue. Sliding windows as per the section on windows.

Flooring

Glazed vitrified tiles from Kajaria Eternity (600 mm x 1200 mm) from ArihantBuildtech catalogue.

Floor to floor height (including slab)

Upto 10 ft.

False Ceiling

Not included

Warranty


  • Your Home comes with a warranty as part of the Turnkey Agreement
  • Warranty is for:

» 10 years warranty on structure

» 1 year warranty on seepage

» 1 year general warranty

» Most of the finishing material used is with third-party warranty such as wardrobes, kitchen, doors, windows, bathroom fittings and fixtures etc.

  • At the time of handover, we will share:

» Drawings

» Third party warranty documents

» Compilation of warranty duration on each product, scope of warranty and contact details

» Originals of security deposit bills and relevant papers for service like water electricity

Payment Schedule

(For a typical Stilt + 4 Floors configuration)

Milestones

Payment

Tentative Schedule

Milestone Definition

Contract Signing

2.5%

Signing of 'Turnkey Contract' between plot owner and ArihantBuildtech

Floor Plan Sign-off

2.5%

Within 45 days of contract signing

Finalization of Floor Plan between plot owner and ArihantBuildtech

Handover of Plot

2.5%

Plot Handover for start of demolition/construction.

Start of Construction

2.5%

Day 0

After completion of demolition (if applicable). In case of no demolition, this milestone coincides with milestone 3.

Start of Each Slab

32%(Divided equally over number of slabsi.e 8% on each slab)

Month 2-5

Start of column erection for each floor. Each floor, stilt or basement (if any) to have 1 slab each.

Start of Brickwork

5%

Month 6

Start of brickwork on a floor.

Start of Services

(AC Plumbing, Electrical)

10%

Month 7

1st day of work commencement on site for either of the services mentioned.

Start of Flooring

15%

Month 8

On placement of the first order for flooring material.

Start of Woodwork (Door, window etc.)

10%

Month 9-10

On placement of the first order for woodwork material.

Start of Finishing

10%

Month 11-12

1st day of delivery of paint at site (all paint might not be delivered to site on the same day).

Start of Fitting & Fixtures

4%

Month 13-14

1st day of delivery of Bathroom Fixtures on site (all fixtures might not be delivered to site on the same day).

Handover & Completion Certificate

4%

Month 15

Handover with warranty, certificates, legal papers etc.

Notes

  • Anything not mentioned in this document is not part of our scope.
  • Brands are mentioned in the scope of document to suggest the different options available. ArihantBuildtech reserves the right to use any of the mentioned options. For catalogue items, clients can make brand selections as per their choice.
  • Upper limits mentioned in certain sections (e.g. windows upto 15% of covered area) are not included as a standard. Upper limits are just the boundary limits for this SOW. In case the design leads to a lower figure, it will not imply a reduction/refund in price.
  • Post CC work is not included in this SOW. If required, any post CC work will be done using dry construction methods.
  • By nature home-building is a labour intensive & human centric process. Despite precautions, it involves errors/mistakes during the project. ArihantBuildtech assures to address these as per the relevant codes/generally accepted construction practices.
  • At times, there is a time gap between selection of a material and placement of its order. If during the placement order, it is realised that material is discontinued or has a unusually longer lead time, then client will be requested for a re-selection in a short time duration, as an exception.